top of page

ACTUALITÉS

PLAN D'ACTION DE REINSTALLATION (PAR) POUR LES POSTES DE LA GAMBIE <br><br>RESETTLE

  • UGP Energie
  • 3 déc. 2018
  • 1 min de lecture

The purpose of this RAP (Resettlement Action Plan) is to mitigate the impacts and to compensate losses and inconvenience suffered by those affected by the construction of the 2 sub-station in Gambia.

Comments


Posts Récents
Archives
Rechercher par Tags
Retrouvez-nous
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page